FOCUS ON

Fort York bridge in Toronto, first of its kind in Canada made of UR™ 2205 Duplex stainless steel from Industeel.

Fort York bridge in Toronto, first of its kind in Canada made of UR™ 2205 Duplex stainless steel from Industeel.

Industeel supplied 300 tons of UR TM 2205 Duplex stainless steel plates (15 to 35 mm thick) from its mills of Charleroi and Le Creusot with a very stringent surface quality requirement to t...

READ MORE 

News

75 th anniversary of the D-Day
2019-06-05
75 th anniversary of the D-Day

A monumental sculpture called « Les Braves » designed by Anilore BANON, is exhibited on Omaha beach since 2004.

Created on the occasion of the 60th anniversary of the Normandy landing, "The braves" serves as a significant tribute to the courage of the Allied Forces soldiers who sacrificed their lives for the liberty of  peoples and as a reminder to coming generations that those who died did so in defense of the values of tolerance and freedom.

Industeel is proud to have supplied the stainless steels UR ™2205 to materialise the memorial.

See also...
Eurocorr 2019

The annual Eurocorr congress organized by the EFC (European Federation of Corrosion) will be held on 9-13 September in Seville, Spain. This congress with more than 1,000 participants is the most impor...

the Best Paper of ASME PVP2018 (Prague) for the “Material and Fabrication (M&F)” track.

During ASME PVP2019 (Pressure Vessel and Piping division conference) held in San Antonio (Texas, US...

Fort York bridge in Toronto, first of its kind in Canada made of UR™ 2205 Duplex stainless steel from Industeel.

Industeel supplied 300 tons of UR TM 2205 Duplex stainless steel plates (15 to 35 mm thick) from its mills of Charleroi and Le Creusot with a very stringent surface quality requirement to t...