Logo ArcelorMittal
Search Close

Lean Duplex UR™ 2202 prefabrication for a work of art.

Scroll down to explore

Published on : 20/03/2020

Following the previous news about this iconic project .

The pieces for the elements of the structure and for the roof have been prefabricated in our workshop at Dunkirk.

They were cut and bent from plates of 12 m in length and up to 2.5 m in width.

The pieces for the structure will be shipped for assembly to Pyrrhus workshop while those for the roof will be stored and shipped directly on site for the final assembly.

These success stories may be interesting

Oil and Gas
Oil and Gas – Barzan Pipeline Replacement Project
Read the case study
Power Generation
Power Generation – ITER India
Read the case study