Logo ArcelorMittal
Search Close

Inauguration of the New Vertical Continuous Caster at Le Creusot, France

Scroll down to explore

Published on : 24/04/2026

April 23rd, 2026,  marked a significant milestone in Industeel’s journey as we inaugurated a major new industrial facility at our Le Creusot site in France: a Vertical Continuous Caster.

The inauguration took place in the presence of several political representatives and industry leaders, including Sébastien Martin, French Minister Delegate for Industry, as well the Industeel and ArcelorMittal Group’s management.

This €52 million investment was built in collaboration with the French government as part of their “France 2030” plan. The vertical caster is one of the most significant commitments made by Industeel in recent years. It marks a decisive step in the modernisation of our industrial facilities and strengthens our ambition to produce increasingly efficient and sustainable steel.

The new vertical continuous caster enhances our production capabilities by improving the quality and consistency of steel while optimising process efficiency. It also contributes to our commitment to reducing our environmental footprint, in line with ArcelorMittal’s XCarb® initiative, which focuses on lowering CO₂ emissions through innovative technologies and more sustainable production methods.

Experience the journey behind the construction of the Vertical Continuous Caster through this film, showcasing the innovation, teamwork, and commitment that made this landmark project possible:

These success stories may be interesting

Oil and Gas
Oil and Gas – Barzan Pipeline Replacement Project
Read the case study
Power Generation
Power Generation – ITER India
Read the case study