FOCUS ON

Fort York bridge in Toronto, first of its kind in Canada made of UR™ 2205 Duplex stainless steel from Industeel.

Fort York bridge in Toronto, first of its kind in Canada made of UR™ 2205 Duplex stainless steel from Industeel.

Industeel supplied 300 tons of UR TM 2205 Duplex stainless steel plates (15 to 35 mm thick) from its mills of Charleroi and Le Creusot with a very stringent surface quality requirement to t...

READ MORE 

News

Industeel supports the Triathlon du Pilon
2018-05-25
Industeel supports the Triathlon du Pilon

For the second year in a row, Industeel supported the Triathlon du Pilon, a sporting event organized in Le Creusot. The triathlon took place on the nautical base of Torcy this Sunday, May 20th. Thanks to the excellent organization of the first edition, the event has been included this year in the regional championship Bourgogne Franche-Comté for young people, and the 10-13 years old session has become a real triathlon. With 580 runners, i.e. twice as many as in the previous and first edition, the Triathlon du Pilon settles as one of the main triathlon events of the region. Even the best French triathlete, and 2015 world champion, took part in the race. A special congratulations to Alexandre Pawezka, R&D technician at Industeel Le Creusot, who took the third place on the podium.

See also...
Corrosion Technology Week 2019

The Corrosion technology Week will be held on 15-19 September in Saint Louis, Missouri.

Come and meet our experts during the week:
Eurocorr 2019

The annual Eurocorr congress organized by the EFC (European Federation of Corrosion) will be held on 9-13 September in Seville, Spain. This congress with more than 1,000 participants is the most impor...

the Best Paper of ASME PVP2018 (Prague) for the “Material and Fabrication (M&F)” track.

During ASME PVP2019 (Pressure Vessel and Piping division conference) held in San Antonio (Texas, US...