FOCUS ON

Industeel installs 1500 solar panels on the plant’s roof in Charleroi

Industeel installs 1500 solar panels on the plant’s roof in Charleroi

In December 2019, Industeel signed their first photovoltaic contract for the installation of more than 1500 solar panels to be mounted on the roof of the plant in Charleroi. These panels have ...

READ MORE 

News

Eurocorr 2019
2019-08-19
Eurocorr 2019

The annual Eurocorr congress organized by the EFC (European Federation of Corrosion) will be held on 9-13 September in Seville, Spain. This congress with more than 1,000 participants is the most important event about corrosion in Europe.

This year, Industeel participate to the event with two technical presentations:
  • “Electrochemical techniques to detect intermetallic phases in duplex stainless steels microstructure”
    - Thursday 12th at 2 pm room Sevilla 2 (Session Corrosion Mechanisms, Methods & Modelling)
  • “Influence of ferrite content in Heat Affected Zone of duplex stainless steels in sour environment”
    - Thursday 12th at 2:40 pm in room Andalucia 4 (Session Corrosion in the Refinery & Petrochemistry Industry)
Come and meet our stainless steels experts during the week:
  • Dr Martin Monnot, R&D researcher, attending Eurocorr from 9 to 13 September
  • Dr Pierre Petit, product manager for stainless steels, attending Eurocorr from 9 to 13 September
  • Dr Sandra Le Manchet, R&D researcher, attending the Maintenance Panel/ISO 15156 meeting on 6 September

See also...
Industeel is now an approved source of materials for Dow Chemical projects

Industeel has officially been added to the last revision of the Dow Chemical plates suppliers list:  G8S-4010-01 - Requirements for Fabricator’s Purchase of Materials to be Used in Equipment for Do...

New datasheet for Creusabro M

What is Creusabro® Manganese ? Creusabro® M is the genuine fine-grained 12-14%Mn austenitic manganese steel (Hadfield steel) hot-rolled plate. 12-14% Mn austenitic manganese steel shows an outst...

Industeel installs 1500 solar panels on the plant’s roof in Charleroi

In December 2019, Industeel signed their first photovoltaic contract for the installation of more than 1500 solar panels to be mounted on the roof of the plant in Charleroi. These panels have ...