FOCUS ON

Welcome to our universe

Welcome to our universe

It took many months to shoot and especially edit the new film of Industeel. Now it is ready to be unveiled to all the people who will be eager to discover it.

READ MORE 

News

UR™ 2205 duplex plates prefabricated by Industeel Dunkerque for Stockholm New Slussen project.
2020-11-18

The construction of the New Slussen is one of the largest urban transformation projects in Sweden. Working in collaboration with the City of Stockholm, the SEK 12 Billion project seeks to create a dynamic urban quarter, responding to its historic context and transforming the city centre.

One important function for New Slussen is to reduce the threat of flooding and protect the drinking water for two million people in Mälardalen. And that is where Industeel comes in... 

Rendering picture of the New Slussen - Slussen, built in 1642, is the lock that separates the sea from the fresh water of Lake Mälaren.

New Slussen is important for the whole region

The rebuilding of Slussen is of great significance for Stockholm, and also for the rest of Mälardalen.

Stainless duplex plates manufactured by Industeel Belgium and formed at Industeel Dunkerque will be welded together to make a flood gate around 36 metres long. These will be mounted on Lake Mälaren. The plates will help to reduce the threat of flooding and to protect drinking water for the people of Mälardalen.

The water level of Lake Mälaren is controlled at several places in Stockholm and Södertälje by allowing the water to drain from the lake into the sea. When large quantities of water flow into Lake Mälaren because of melting snow for example, not enough water can flow into the sea.

By building new, largers canals at Slussen, today's threat of flooding can be removed. In this way, access to drinking water is assured and vulnerable areas, such as the underground station in the Old Town, regional airports and other important infrastructure buildings and agricultural land, are protected from the current threat of flooding.

Changing the control of the lake's water level also benefits the wildlife around the beaches of the Mälaren, improving conditions for birds, bats, dish and frogs with a higher water level in the spring. There will also be advantages for shipping, particularly in reducing the risk of running aground.

View of the project

 

Cityscape view from above of large contruction site at the Old Town and Slussen in Stockholm, Sweden

 

See also...
New WRS Creusabro brochure in arabic !

After English, French, Russian, Spanish, Swedish, Creusabro® Brochure is now available in ARABIC! As usually:

  • Presentation of Creusabro® grades
  • Concept a...

New datasheet for XC06 High Purity Ultra Low Carbon Steel for Magnet applications

What is XC06 ? Available as bulk solid plate up to 825 mm thickness, XC06 is a soft ferromagnetic iron providing high saturation polarisation, high permeability and low coercitive force with excell...

Presence of Industeel at IDEX 2021

Industeel team invites you to visit us on our booth n° 07-B23 at IDEX 2021 from 21st to 25th February (Abu Dhabi, UAE). We are looking forward to meeting you on our stand!